642 SW NORMANDY RD APT 2 SUITE #2 NORMANDY PARK, WA 98166 Get Directions
642 SW NORMANDY RD APT 2 SUITE #2 NORMANDY PARK, WA 98166 Get Directions
NER specializes in On-Site Thermal Desorption, the most environmentally sound way of eliminating toxicity in contaminated soils. Using technologically advanced Thermal Desorption Units (TDU's), NER can quickly reclaim a site regardless of what type of soil is present. From contaminated ‘gumbo’ clay or sand, flare pit materials to crude oil from pipeline ruptures, NER can remove contaminants in even the most remote sites or extreme weather conditions.
The NER Advantage:
Liability Elimination: On-site Extraction & Destruction of Toxic Organic Compounds
Time: Large Volume Processing, 24 hrs./day, Year-Round, Any Climate
Cost: Competitive and Predictable
Experience: 15 Years Thermal Operations
Clean: Meets or Exceeds Regulatory Emissions Levels
Guaranteed Results: Per Tonne, Clean Dirt Invoicing
© Dun & Bradstreet, Inc. 2024. All rights reserved.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.